April 19, 2026

Bisigheim Sewer Inspection

Project details.

client
Deutsche Bahn AG
power
Sewer inspection in track construction
site
Bisigheim, Baden-Württemberg
area
Canals & Drainage
date
January 2022
pith
rail infrastructure

Route channels under the microscope

Drainage systems along railway lines are invisible during normal operation — and often only become an issue when they fail. Clogged longitudinal channels, roots in transverse passages or deposits in seepage lines can endanger the track substructure before anything is visible on the outside. On behalf of Deutsche Bahn AG, Klefenz GmbH carried out a systematic inspection of the route canalization in Bisigheim.

The inspection included all drainage components of the route section: longitudinal canals, transverse passages and intake shafts. Each section was inspected with a pipe camera, the condition was assessed and documented in a structured damage report.

klefenz

Parallel to the camera inspection, any deposits found were immediately removed by high-pressure flushing. Sections that had structural damage were classified as remediation cases in the report and provided with coordinates so that the DB route service could plan a targeted repair. Klefenz handed over the report, including video documentation of all inspected sewer sections.

Precaution beats repair

A regular sewer inspection is cheaper than the follow-up costs of a softened track substructure. Klefenz offers sewer inspection as an independent service for DB routes — with the technology, approvals and reporting quality that the DB route service requires for maintenance planning.

klefenzklefenz

Scope of services at a glance

  • Camera inspection of longitudinal channels, transverse passages and intake shafts
  • High-pressure flushing and cleaning for deposits and roots
  • Damage assessment according to DB classification
  • Video log and photo documentation of all sections
  • Delivery of inspection report with remediation recommendation

Route channels under the microscope

Drainage systems along railway lines are invisible during normal operation — and often only become an issue when they fail. Clogged longitudinal channels, roots in transverse passages or deposits in seepage lines can endanger the track substructure before anything is visible on the outside. On behalf of Deutsche Bahn AG, Klefenz GmbH carried out a systematic inspection of the route canalization in Bisigheim.

The inspection included all drainage components of the route section: longitudinal canals, transverse passages and intake shafts. Each section was inspected with a pipe camera, the condition was assessed and documented in a structured damage report.

Parallel to the camera inspection, any deposits found were immediately removed by high-pressure flushing. Sections that had structural damage were classified as remediation cases in the report and provided with coordinates so that the DB route service could plan a targeted repair. Klefenz handed over the report, including video documentation of all inspected sewer sections.

Precaution beats repair

A regular sewer inspection is cheaper than the follow-up costs of a softened track substructure. Klefenz offers sewer inspection as an independent service for DB routes — with the technology, approvals and reporting quality that the DB route service requires for maintenance planning.

Scope of services at a glance

  • Camera inspection of longitudinal channels, transverse passages and intake shafts
  • High-pressure flushing and cleaning for deposits and roots
  • Damage assessment according to DB classification
  • Video log and photo documentation of all sections
  • Delivery of inspection report with remediation recommendation
What the eye does not see
Video inspection of track canals in Bisigheim
Result: Complete claims overview as a basis for planning

With the inspection report, Deutsche Bahn AG has a complete status overview of all canal sections in the Bisigheim line area. The immediately cleaned sections are functional again; the need for renovation is clearly documented. Klefenz has thus provided the basis for targeted and budget-friendly maintenance planning.

Marvin Klefenz
Managing Director & Head of Department
Deutsche Bahn AG
client

Let's Build Something Together.

Whether you are planning a demanding construction project or looking for a new career path – Klefenz stands for experience, reliable collaboration and a clear commitment to quality. If you want to realise a project with us or become part of our team, we look forward to starting the conversation and taking the next step together.

Mitarbeiter in Klefenz Kleidung auf der Baustelle im Einsatz.
Mitarbeiter der Klefenz GmbH vor einer Baumaschine auf dem Betriebsgelände.
Team der Klefenz GmbH auf einer Baustelle mit Arbeitskleidung und Kabeltrommel im Hintergrund.
More about us
Find out more about Klefenz, our company, our attitude and what shapes our work in everyday life.
Mitarbeiter bearbeitet Stahlrohre für den Rohrleitungsbau auf einer Baustelle.
testimonials
Get an insight into selected projects and see what our work looks like in practice.
Mitarbeiter der Klefenz GmbH vor einer Baumaschine auf dem Betriebsgelände.
performances
Discover our range of services and find out in which areas we implement projects with experience, precision and reliability.